After the damp proof work, the next first fixing stages; new door way was made for the ensuite, built in wardrobe framed and skimmed. Then onto the second fix and interior with a fully tiled wet room, second fix carpentry – skirting/architrave, electrics with white downlights and fixings, painting // decorating and wool carpets.